Industrial

  • Monster Jam

    Plote Construction teamed up with Monster Jam and Feld Motorsports to deliver material to All State Arena.
  • O’Hare Central De-Icing Facility

    The purpose of this project is to create a deicing pad for O’Hare International Airport to facilitate the spraying of deicing agent on the aircrafts prior to departure. This includes over a half million cubic yards of earthen material to be moved, 220,000 cubic yards of concrete, 300,000 tons of asphalt, electrical, and underground improvements.
  • Sheridan Rd. - Evanston, IL – Reconstruction

    Plote was contracted to reconstruct Sheridan Rd. in Evanston, IL - the main campus artery for Northwestern University students and faculty as well as those commuting the Lake Michigan shoreline. A high profile project for both the City and University, replacing the roadway with concrete pavements and a dedicated bike lane will service its users for decades to come.
  • Hillside Town Center - Hillside, IL

    170,000 square feet of Retail 15 acre site Excavation, Site Utilities, Underground Storm Water Detention, Concrete and Paving
  • Schaumburg Resurfacing

    Through the course of a year Plote Construction takes on many municipality projects in various communities. The Village of Schaumburg is one of these communities. Plote Construction coordinates not only grinding and paving work but also the multitude of subcontractors that perform on this project. From the concrete contractor along with seal coating and underground subcontractors, Plote Constructions ability to manage a multi-facet project makes Plote a leader in the residential rehabilitation market.
  • Chicago’s O’Hare Airport cargo expansion.

    Plote partnered with FCL Builders and the developer Aeroterm to build this cargo expansion at O'Hare Airport in Chicago, IL. Plote's excavation, concrete and asphalt divisions will be responsible for 700,000 SF of air cargo facilities, 245,000 SY of PCC taxi lane and apron, 25,000 SY of asphalt paving and 150,000 CY of excavation.
  • Adesa Inc.

    Plote Construction, Inc. was hired by Advanced Interiors in July 2015 to complete the mass excavation and paving work for the new Adesa Inc. auction location in Hoffman Estates, IL. This approximate 60 acre site will eventually contain 4 buildings, parking lots containing 4,214 parking stalls, a 16.3 acre detention basin, and a test track. The project will be complete by late summer 2016.
  • O’Hare Runway 9R-27L Comprehensive Maintenance

    The purpose of this job was to completely rehabilitate an existing runway at O’Hare airport in Chicago, IL. This included completely removing two taxiways. Replacing all of the runway lights including all pavement lights. To mill off three inches from the surface and replace with new asphalt, and shoulders.
  • Holiday Inn Express Hotel & Suites – Hillside, IL

    75,000 square feet 5-story Hotel 2 acre site Excavation, Site Utilities, Underground Storm Water Detention, Concrete and Paving
  • Super Target – Hillside, IL

    185,000 square feet Retail Store 12 acre site Excavation, Site Utilities, Underground Storm Water Detention, Concrete and Paving
  • Chase Bank – Hillside, IL

    Pad Preparation, Underground Utilities, and Dry Utility Sleeves
  • BOULDER RIDGE GOLF COMMUNITY

    • 602+/- Acres
    • 855 Residential Units
    • 27-hole golf course
    • Mass Grading, Underground and Roadways
    • Located in Lake in the Hills, IL
  • THE COVES, ALGONQUIN

    • 207+/- Acres
    • 316 Residential Units
    • Mass Grading, Underground and Roadways
    • Located in Algonquin, IL
  • FAIRWAY VIEW ESTATES, ALGONQUIN

    • 37+/- Acres
    • 58 Residential Units
    • Mass Grading, Underground and Roadways
    • Located in Algonquin, IL
  • Algonquin Corporate Condos – Algonquin, IL

    62,000 square feet Commercial/Industrial Building 9 acre site Excavation, Site Utilities, Concrete, Paving, and Erosion Control